Hot line for investors

+7 861 251 77 64 econom@krilovskaya.ru

Construction of a logistics center for the processing and storage of fruits and vegetables

Documents

Project nameConstruction of a logistics center for the processing and storage of fruits and vegetables
Industry classificationAgriculture
Basic information about the project
Project essenceThe municipality Krylov area
Project capacity21600 t / simultaneous storage
Consumer market descriptionThe project provides for construction of a logistics center for the processing and storage of fruits and vegetables
Object construction term1.00
Competitive advantageConsumers of these products are residents Krylovskogo region, residents of the Krasnodar Territory, and surrounding areas
Resource availability for project realizationEquity Investor
Planned volume of resource consumption (annual)
Planned volume of electricity consumption (annual), MWh855.00
Planned volume of gas consumption (annual), million cubic meters0.04
Planned volume of water consumption (annual), million cubic meters 
Financial estimation of the project
Total cost of the project, mln rubles116.36
Own resources, million rubles116.36
Means of regional (municipal) budget, million rubles 
Previously involved means, million rubles 
Investment capacity, mln rubles116.36
Conditions of investor participationDirect investments
Form of investments returnmoney
Payback period4.75
Basic indicators of investment project economic efficiency
Net present value (NPV)21.12
Simple payback time4.75
Discounted payback period7.50
Internal rate of return (IRR)14.63
Productivity index (PI)1.11
Income per year 64.64
Social efficiency of investment project
Number of workplaces23
Salary average level (thousand rub per year)294000.00
Budgetary efficiency of investment project
Mid-annual tax payments, million rubles15.22
which includes into consolidated budget of the krai, million rubles7.38
General information about the ground area
Address of the areaKrasnodar territory, Krylovsky district, Krylovsky station, the territory of the SEC "Voskhod"
Cadastre account of ground areaRegistered
Cadastre number of area/of quarter23:14:0304000:49
Declared area (m2)100000.00
Limit size of the area (m2)100000.00
Land categoryLands of inhabited localities
Kind of allowed useAgricultural activity
Actual useNot used
Availability of buildings, structures, constructionsNo
Permits, town-planning documentationThe scheme of territorial planning of the municipality Krylov area (pending approval) prepared by JSC "Territorial Planning Institute of the Krasnodar Territory"
Information about proprietor (right holder)
Proprietorstate ownership
Right holderUnder the authority of the October rural settlement
Kind of rightAnother
Information about encumbrance and limitation
Kind of encumbrance, limitationNo
Encumbrance area 
Electricity supply
Power supply center (name, right-holder)PJSC "Kubanenergo"
Power supply center (electrotension class)High class of tension – from 110 kV to 220 kV
Power supply center (free power (MWt))1.00
Power supply center (distance(m)) 
Nearest connection point (network tension, kV) 
Nearest connection point (distance(m)) 
Gas-supplying
Gas pipeline (name, right-holder)JSC Gazprom gas distribution Kasnodar
Gas pipeline (diameter(mm))160.00
Gas pipeline (pressure(MPa))High pressure pipelines of the II category – from 0,3 to 0,6
Gas pipeline (carrying capacity(cube. m.in a year))10000.00
Gas pipeline (distance(m))200.00
Nearest connection point (diameter(mm))160.00
Nearest connection point (pressure (MPa))High pressure pipelines of the II category – from 0,3 to 0,6
Nearest connection point (carrying capacity (cubic meter a year))10000.00
Nearest connection point (distance(m))200.00
Water-supply
Water supply source (name, right-holder)Provide independ-ent water supply (Device hole)
Water supply source (power (cubic meters a day)) 
Water supply source (distance(m)) 
Nearest connection point (power (cubic meters a day)) 
Nearest connection point (diameter(mm)) 
Nearest connection point (distance(m)) 
Sewage system
Type of building (name, right-holder)centralized sewage is no need to build local septic tank
Type of building (power (cubic meters a day)) 
Type of building (distance(m)) 
Nearest point of connection (power (cubic meters a day)) 
Nearest point of connection (diameter(mm)) 
Nearest point of connection (distance(m)) 
Installation of telephones/internet
Central network (distance(m)) 
Mobile communication (distance(m)) 
Rated price of the ground area supplying with engineering, mln.rub5.40
Distance to the large settlements and objects of a transport infrastructure
Remoteness fromNameDistance (km)
center of municipal formation Art. Krylovskaya 
nearest settlement Art. Krylovskaya 
Center of federal subject Krasnodar city180.00
highways (regional, federal value) M413.00
highways of local value   
nearest railway station Railway station Krylovskaya15.00
nearest railway Railway station Krylovskaya15.00
airport Krasnodar airport190.00
seaport seaport Yeysk160.00
Additional information about the ground area
Cost of rent/buy of the ground area, mln. rub6.00
Geographical coordinates of object (dd.dddddd)
Latitude (N)39.931219
Longitude (E)46.317572
NotesNo
Data on the project initiator (in case of existence information about the legal/physical person)
Name / Full nameThe administration of the municipality Krylov area
Postal address352080, Art. Krylovskaya Str. Ordzhonikidze, 43
Sitewww.krilovskayà.ru
Phone/fax8(86161) 31-4-84/31-3-73
E-mail addressadm@krilovskaya.ru
Data about the applicant (executive authority/local government executive authority)
NameThe administration of the municipality Krylov area
Postal address352080, Art. Krylovskaya Str. Ordzhonikidze, 43
Sitewww.krilovskayà.ru
Phone/fax8(86161) 31-4-84/31-3-73
E-mail addressadm@krilovskaya.ru
Executive (Full name, work position, phone number)Nikolai Fedorenko, Category 1 specialist, 8 (86161) 32181